GENERAL REQUIREMENTS FOR ELECTRICAL INSPECTIONS CHECKLIST

 


1.1. Identify installations or parts of installations that are covered by the [QHSE DOCUMENTS].

1.2. Verify that installations have been made in accordance with the instructions included in listing and labeling of materials and equipment.

1.3. Identify installations and equipment requiring special approval or investigation.

1.4. Verify that interrupting ratings and short-circuit current ratings are adequate for the conditions of the installation.

1.5. Verify that unused openings have been effectively closed.

1.6. Check for broken or damaged parts and contamination by foreign materials.

1.7. Check for secure mounting and adequate ventilation space for equipment.

1.8. Check for proper use and ratings of splices and terminations.

1.9. Check temperature ratings of terminations.

1.10. Check for arc flash protection warning signs.

1.11. Check for markings on enclosures and verify appropriate ratings for the environment.

1.12. Verify adequate working clearances, dedicated spaces, and headroom around equipment.

1.13. Verify that working space and dedicated space are not used for storage.

1.14. Check adequacy of entrance to and egress from working space in general and verify that spaces containing large equipment have at least two entrances/exits or the equivalent.

1.15. Verify that working spaces have adequate illumination.

1.16. Check for identification of disconnecting means and circuit directories for panel boards, switchboards, switchgear and similar equipment.