METHOD STATEMENT-PREPARATION & CONSTRUCTION OF CAST-IN PLACE CONCRETE WORKS

 

METHOD STATEMENT FOR PREPARATION AND CONSTRUCTION OF CAST IN PLACE CONCRETE WORKS FOR SUBSTRUCTURES
METHOD STATEMENT FOR PREPARATION AND CONSTRUCTION OF CAST IN PLACE CONCRETE WORKS FOR SUBSTRUCTURES

The following is the “Method Statement for Preparation and Construction of Cast-in-Place Concrete Works for Substructures”. To download the complete editable file, click on the link given at the end of these lines. Visit frequently to get more HSE documents such as Civil Engineering Methods, Construction Method Statements, and Method Statements for Civil Works.

Table of Contents

1. Purpose

2. Scope

2.1. Concrete Pile Cap

3. Excavation and Site Preparation:

3.1. Excavators

3.2. Backhoes

3.3. Bulldozers

3.4. Loaders:

Formwork and Shuttering

3.5. Formwork Systems

3.6. Shoring Systems

3.7. Concrete Vibrators

Concrete Mixing and Transportation

3.8. Concrete Mixers

3.9. Concrete Pumps

3.10. Transit Mixers

Placement and Finishing

3.11. Concrete Buckets

3.12. Concrete Screeds

3.13. Trowels

3.14. Concrete Floats

3.15. Power Trowels

3.16. Concrete Edgers

Curing and Protection

3.17. Curing Blankets

3.18. Concrete Sealers

Testing and Quality Control

3.19. Concrete Testing Equipment

3.20. Surveying Equipment

Safety Equipment

3.21. Personal Protective Equipment (PPE)

3.22. Fall Protection Equipment

4. General Safety Measures

4.1. Site Assessment

4.2. Emergency Response Plan

4.3. Personal Protective Equipment (PPE)

4.4. Training

Excavation and Site Preparation

4.5. Trenching Safety

4.6. Equipment Operation

Formwork and Shuttering

4.7. Formwork Inspection

4.8. Fall Protection

Concrete Mixing and Transportation

4.9. Ventilation

4.10. Material Handling

Placement and Finishing

4.11. Concrete Pouring

4.12. Equipment Safety

Curing and Protection

4.13. Curing Blankets

Testing and Quality Control

4.14. Safe Testing Practices

Safety Communication

4.15. Signage

4.16. Communication Protocols

Environmental Considerations

4.17.Weather Conditions

4.18. Environmental Protection

5. Preparation works before casting the concrete pile cap

6. Pouring of Concrete to Pile Cap

7. For Hot Weather Concreting

8. Curing of Concrete

9. Removal of Formworks

10. Concrete Repair Works

11. Backfilling

12. Concrete Tie Beams/Footings

13. Pouring of Concrete to tie beams/footings

14. Curing of Concrete Tie Beams

Download File

Leave a Reply

Your email address will not be published. Required fields are marked *