| METHOD STATEMENT FOR PREPARATION AND CONSTRUCTION OF CAST IN PLACE CONCRETE WORKS FOR SUBSTRUCTURES |
The following is the “Method Statement for Preparation and Construction of Cast-in-Place Concrete Works for Substructures”. To download the complete editable file, click on the link given at the end of these lines. Visit frequently to get more HSE documents such as Civil Engineering Methods, Construction Method Statements, and Method Statements for Civil Works.
Table of Contents
1. Purpose
2. Scope
2.1. Concrete Pile Cap
3. Excavation and Site Preparation:
3.1. Excavators
3.2. Backhoes
3.3. Bulldozers
3.4. Loaders:
Formwork and Shuttering
3.5. Formwork Systems
3.6. Shoring Systems
3.7. Concrete Vibrators
Concrete Mixing and Transportation
3.8. Concrete Mixers
3.9. Concrete Pumps
3.10. Transit Mixers
Placement and Finishing
3.11. Concrete Buckets
3.12. Concrete Screeds
3.13. Trowels
3.14. Concrete Floats
3.15. Power Trowels
3.16. Concrete Edgers
Curing and Protection
3.17. Curing Blankets
3.18. Concrete Sealers
Testing and Quality Control
3.19. Concrete Testing Equipment
3.20. Surveying Equipment
Safety Equipment
3.21. Personal Protective Equipment (PPE)
3.22. Fall Protection Equipment
4. General Safety Measures
4.1. Site Assessment
4.2. Emergency Response Plan
4.3. Personal Protective Equipment (PPE)
4.4. Training
Excavation and Site Preparation
4.5. Trenching Safety
4.6. Equipment Operation
Formwork and Shuttering
4.7. Formwork Inspection
4.8. Fall Protection
Concrete Mixing and Transportation
4.9. Ventilation
4.10. Material Handling
Placement and Finishing
4.11. Concrete Pouring
4.12. Equipment Safety
Curing and Protection
4.13. Curing Blankets
Testing and Quality Control
4.14. Safe Testing Practices
Safety Communication
4.15. Signage
4.16. Communication Protocols
Environmental Considerations
4.17.Weather Conditions
4.18. Environmental Protection
5. Preparation works before casting the concrete pile cap
6. Pouring of Concrete to Pile Cap
7. For Hot Weather Concreting
8. Curing of Concrete
9. Removal of Formworks
10. Concrete Repair Works
11. Backfilling
12. Concrete Tie Beams/Footings
13. Pouring of Concrete to tie beams/footings
14. Curing of Concrete Tie Beams