This method statement focuses on the installation of Electrical Wiring for Lighting & Powerpoints. just click on the download link given at the end of this post and use it as per your requirement.
Purpose
The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for the Installation of Electrical Wiring for Lighting & Powerpoints through the guidelines contained herein to ensure that the job execution complies with specifications and serves the intended function to a satisfactory level where applicable in the project building.
Scope
This method statement covers all processes related to the Installation of Electrical Wiring for Lighting & PowerPoints as the following:
Electrical Wiring for Lighting & Powerpoints
- Ensure all the related documents like currently approved shop drawings and load schedules are available with the installation team.
- Transfer the required number of wires from stores to the workplace.
- Before pulling wires, check and ensure there are no sharp edges or burrs to prevent damage while pulling wires.
- Identify the correct size and color. (Following the assigned/specified color coding) of wire, cut to the required length appropriately.
- Do not bunch two circuits together, if done so, for easy installation. shall be removed after installation.
- Pull the wires through conduits with the help of pull wires.
- Ensure no joints are made in any circuit.
- Leave a minimum of 250 millimeters in length or more according to the requirement which should be enough to connect to the desired terminals.
- Cover Conduit junction boxes with appropriate covers.
![]() |
METHOD STATEMENT FOR ELECTRICAL WIRING FOR LIGHTING & & POWER-POINTS |