METHOD STATEMENT FOR INSTALLATION, TESTING & COMMISSIONING OF DIESEL GENERATOR SET
1-Purpose
The purpose of this Method Statement (MST) is to highlight the
details to be carried out for the installation of [Write Generator power in KV]
Package Diesel Generator Set to ensure that it complies with Project
requirements and specifications.
2-Scope of Work
This written document applies to all installations of emergency
and Packaged Diesel Generator Sets at [Company Name] & [Project Name]. MEP
technicians/manpower, equipment, or devices shall be organized to meet the
schedule as per the approved construction program.
3-Definition
Abbreviation
QAQC -
Quality Assurance Quality Control
MS -Method Statement
MEP -Mechanical, Electrical, Plumbing
RFIA -
Request for Inspection & Approval
MIR - Materials
Inspection Request
ITP -
Inspection and Test Plan
TBT -
Tool Box Talk
Approved” or “Approval
This means accredited in writing by way of the relevant Engineers'
Assistant acting inside the scope of their delegated authority.
Shop Drawings
This means drawings are produced where the agreement designs drawings
require expressing in a more basic form to facilitate construction.
Final Inspection
This “Final Inspection” means the inspection of the records
of works at completion or after pre-determined elements to make sure that all
previous inspections and tests have been satisfactorily conducted and properly documented.
Materials
The term “Materials” means all items covering the materials/substances
or equipment delivered to the work site must be incorporated into the project.
Method Statements
This means a detailed technical document to be read along with the
drawings, specifications, standards, and codes of practice, technical
datasheets, schedules, work instructions, and any other technical document
related to a particular work.
Reference Documents – Specifications, Drawings. Etc.
Project Quality Plan
Project General Specifications
Approved Project Electrical Drawings
Approved Material Submittal
Manufacturer’s Recommendations / Installation Instructions
Tools and Equipment
Equipment / Instrument
Mobile Crane
Insulation Test Meter, Earth Resistance Tester & 11KV Tester
Multimeter Tester
Mechanical Test Tools: Torque Wrench
Tools
Electrician Hand Tools
Crimping Tools
Drilling & Grinding Machines
Spanners
Half Round file
Screw Drivers
Open and Box Wrench
Torque Wrench
Pliers
Crowbar & Hammer
Electrician Hand Tools
Crimping Tools
Drilling & Grinding Machines
Spanners
Half-Round files
Screw Drivers
Open and Box Wrench
Torque Wrench
Pliers
Crowbar & Hammer
4-Manpower
Staff:
Construction Manager
Site Engineer
Supervisor
QC Engineer / Inspector
Quantity Surveyor
Safety Officer
Labor
Foreman
Trade workers
Helpers / Labours
Banks man
Crane Operator
Rigger
Drivers
5-Responsible Personnel on Site
The Project Manager (PM) shall be responsible/accountable for the
overall construction activities.
The manufacturer representative will be responsible for the
overall supervision of Installation and Testing.
The Material/Asset controller shall be responsible/accountable for
receiving materials in the on-site warehouse.
The safety Officer shall make certain that suitable/necessary measures
are in the region at the painting area to avoid any unexpected activities.
QAQC Inspector will be chargeable for wearing out inspections for
the substances brought on-web page. He shall document such inspections.
QAQC Engineer / Inspector shall display the installation
activities progressively and shall file all deviations from the specification in
the form of snags or similarly as non-conformance notifications.
6-Material Inspection / Storage
The Diesel Generator is enclosed kind, Cummins, Model- [00000], 00KV,
3phase, four Wire, 50Hz at 1500 pm.
The trailer
with the Diesel Generator ought to input through the north/west/east/south and
so forth. Avenue of the mission.
Road
closure allows are to be obtained from the municipality earlier than the advent
of the Generator presuming the timing of arrival.
Use the
cell crane to off-load Generators. Make positive that the potential of the cell
crane can convey the burden of the Generator.
The
cellular crane and the trailer ought to be positioned in positive locations
which makes smooth get entry to the Platform.
Use a cellular crane to offload the generator.
Ensure that the generator is properly protected and covered by a
tarpaulin.
Before acceptance, an inspection regarding the physical condition
shall be conducted to ensure that the materials are following the approved
material submittal.
7-Construction Sequence and Methodology
Preparation before Installation
Make sure that the Drawings for Installation are approved & coordinated with other services.
Ensure that the material is free from damage before shifting to
the areas of work.