RISK ASSESSMENT FOR INSTALLATION OF ENERGY MANAGEMENT PANEL

The under discussion occupational health safety and environmental document “Installation of Energy Management Panel” is in an editable and ready-to-use format. just click on the download link given at the end of these points. QHSEDOCS is a totally free source of health and safety documents downloads:

 Hazards

Consequences:

Control Measures

  1. Turn off utility power at the distribution point where the EMP is to be connected. Be sure there is no power.
  2. All installations tested dead (for insulation and resistance) with a multi-function tester before being made live.
  3. All temporary and new installations conform to IEEE Regulations.
  4. Arrange with the Client/Principal Contractor times to isolate the supply, and to connect initial/additional circuits to the EMP.
  5. Ensure the Client/PC has communicated to all other workers.
  6. Complete the connection outside normal site hours whenever possible.
  7. Adequate lighting is provided around the EMP installation area and suitable temporary power to enable the safe installation of equipment.
RISK ASSESSMENT FOR INSTALLATION OF ENERGY MANAGEMENT PANEL
RISK ASSESSMENT FOR INSTALLATION OF ENERGY MANAGEMENT PANEL



DOWNLOAD THE FILE HERE 👇

RISK ASSESSMENT FOR INSTALLATION OF ENERGY MANAGEMENT PANEL
Exit mobile version