Procedural Details for the Following Permit to Work System:

  1. Confined Space Entry
  2. Electrical/ Energy Isolation Work
  3. Excavation
  4. Hot Works
  5. Work with Oversize-Load
  6. Working at Heights
  7. Work with ESD or Fire and Gas Detection System


1.0. Confined Space Entry

1.1. Preparation:

1.2. Training and Communication:

1.3. Entry Procedures:

1.4. Continuous Monitoring:

1.5. Exit Procedures:

2.0. Electrical/Energy Isolation Work

2.1. Risk Assessment:

2.2. Notification and Coordination:

2.3. Isolation Procedures:

2.4. Verification and Testing:

2.5. Work Activities:

2.6. Completion and Restoration:

3.0. Excavation

3.1. Planning and Assessment:

3.2. Utility Marking:

3.3. Excavation Procedures:

3.4. Safety Measures:

3.5. Monitoring and Inspection:

3.6. Backfilling and Restoration:

4.0. Hot Works

4.1. Risk Assessment:

4.2. Preparation:

4.3. Permit and Notification:

4.4. Fire Safety Equipment:

4.5. Hot Work Operations:

4.6. Post-Work Inspection:

5.0. Work with Oversize-Load

5.1. Planning:

5.2. Vehicle Preparation:

5.3. Traffic Management:

5.4. Clearances and Obstacles:

5.5. Safe Driving Practices:

5.6. Communication:

6.0. Working at Heights:

6.1. Risk Assessment:

6.2. Fall Protection Equipment:

6.3. Training and Supervision:

6.4. Equipment Inspection:

6.5. Scaffolding and Platforms:

6.7. Ladder Safety:

6.8. Weather Conditions:

7.0. Work with ESD or Fire and Gas Detection System

7.1. Preparation:

7.2. Isolation and Lockout:

7.3. Permit and Notification:

7.4. Testing and Verification:

7.5. Work Procedures:

7.6. Reinstatement and Testing: