QHSE DOCUMENTS-METHOD STATEMENT FOR FABRICATION AND INSTALLATION OF WOODEN DOORS


The following text is taken from the original method statement for”QHSE Documents-Method Statement for Fabrication and Installation of Wooden Doors”. To download the complete and Word ready-to-use format file, click on the download link at the end of this article.


1. Objective 

The objective of this method of statement is to define the requirements for fabrication, supply, and installation of wooden doors including fire rated for the buildings under the [contract no], Engineering, Procurement, Installation and Commissioning (EPIC) of [PROJECT NAME] and utilities and support service.


2. Scope

Procurement of timber/plywood, fabrication, supply, and installation of wooden doors including fire rated for the buildings in [PROJECT NAME].


3. Reference

Project Approved Drawings and architectural schedules

Standard Specification for Civil Works 

British Standards BS 4169, 4978, 1186, 5628,745, 1204,4071, 1202, 1210, 5803 & 459


4. Personal Protective Equipment 


5. Health & Safety Hazards

Before commencing any of the Fabrication and Installation of Wooden Doors, the team shall strictly follow woodwork Health Safety & Environment recommendations for handling and use of the materials and make sure that all involved working teams shall be aware of the same. 


6. Procedure


7. Records