QHSE DOCUMENTS-EXTREME WEATHER PLAN



This is a free, editable and Word format health and safety document uploaded by qhse documents for its visitors and health and safety professionals Worldwide. This HSE document is “Monsoon Extreme Weather Plan Health Safety & Environment Management System”. Keep visiting frequently blog site at qhse documents and download free of your ready-to-use template.


1. Purpose of the Plan

The purpose of the Extreme Weather plan is to provide a guide as to the actions to be taken if the site or workers are subject to extreme weather. 


2. Project Description  

Write details of your project here.


3. Abbreviations

HSE  Health, Safety and environment 


4. Procedures 

Rain 

Once the rain starts all permits to work approvals will be automatically cancelled and concerned supervision reissue the permit after completing and approval from the site engineer and HSE department.


Working with electrical power tools

There is some potential for such a tool if damaged to electrocute the user. We use 110v equipment and centre-wired arrangements to minimize the current but there is still a danger. Tools therefore must be inspected every day before use. Therefore, during prolonged rain power tools use shall be suspended until the stops. After the rain, all electrical installations and portable power tools/items must be inspected by a competent electrician.


Drawing

If work is being carried out in any area where the rainwater is a pudding or forming a deep reservoir even if temporary then there is some potential for a worker to get into difficulty in that water. Similarly, if there are excavations or boreholes, then a significant depth of water could build up inside and with steep sides, if a worker fell in he would have difficulty escaping from the water. All such boreholes and excavations must be safely barricaded to prevent workers from entering a Zone immediately adjacent to the opening.


Collapse

If the rain is prolonged and heavy it can destabilize any excavations open at the time. Therefore, during such rain, all workers shall be removed from excavations until the rain has stopped and an inspection of the opening is made to verify there are no problems. After the rain all excavations and possible water accumulation areas including manholes to be inspected by the site engineer and the HSE department. Work will commence after the safe-to-work confirmation from the HSE department. 


Work at height

Once the rain starts all work at height activities will be suspended and work will commence only after completing the inspection by the area supervisor to revalidate the scaffolding tag.


5. Resources

6. Heavy Rainy situation management


7. Wind and dust 


Store/stacked material


8. Resources


9. Heavy windy situation management 


10. Emergency response 

If an emergency event comes as a result of extreme weather, the emergency procedure below must be followed

In the event of an emergency situation, the procedure is as follows: 