METHOD STATEMENTS FOR DISMANTLE RELOCATE INSTALLATION TESTING & COMMISSIONING OF WALL MOUNTED SPLIT AC

TESTING & COMMISSIONING OF WALL MOUNTED SPLIT AC


QHSE Documents is totally a free online source of occupational, health and safety documents download site with the aim to help the Worldwide HSE community. This under-discussion topic is regarding the “Method Statements for Dismantle Relocate Installation Testing & Commissioning of Wall Mounted Split AC” and to get an editable Word format file, click on the link given at the end of this post.


1. Purpose

The purpose of this methods statement is to describe the systematic and quality procedure for the different activities required for the installation, testing & commissioning of wall-mounted split AC to make sure that all Dismantle, Relocate, Installation, Testing & Commissioning Wall Mounted Split AC works are accomplished by following the contract specification, approved shop drawings and as per the Manufacturer’s Instruction and recommendation.


2. Scope

This method of statement covers the dismantling, relocation, re-installation, test and commissioning of decorative split Air Conditioning, units with a cooling capacity of 1.5 to 3 tons. Include all associated civil, electrical, and mechanical works required for installation and operation. 


3. Responsibility

It will be the responsibility of the Project Manager and Project Engineer to ensure the availability of coordinated drawings and the required materials as per the project specifications. Split A/C will be commissioned by the experienced foreman/Technician under the supervision of site engineers. QHSE Team is responsible to ensure the implementation of the method of statement, safety norms and implementing the risk assessment measure. 


4. Legislation & Code of Practice 

All dismantling, relocation, installation, testing & commissioning wall-mounted split AC work shall be accomplished following mentioned in the project specifications.


5. References 

Approved material submittal


6. Definitions

PPE         Personal Protective Equipment 

ITP          Inspection & Testing Plan

PM         Project Manager 

PE           Project Engineer 

QC          Quality Control

HSE        Health, Safety & Environment


7. Required Equipment


8. Safety Precautions


9. Methodology


9.1. Dismantle and relocation of the unit 


9.2. Decorative type Split Unit

Drain pipes are connected to the drain point accurately and as per the design.


9.3. Condensing Unit


9.4. Power / Control wiring connection


10. Testing and Commissioning Sequence /Methodology

10.1. Pre-Commissioning Procedure

DOWNLOAD THE METHOD STATEMENT 

Dismantle, Relocate, Installation, Testing & Commissioning Wall Mounted Split Air Conditioner