METHOD STATEMENT FOR WORKING AT HEIGHTS-SCAFFOLDING


This safe work method statement
uploaded by QHSE documents for the “Method Statement For Working at heights for scaffolding”
is in editable and ready-to-use format and will answer various questions such
as 
QHSE documents How do you erect scaffolding step by step? What
are the three main scaffolding types? What is the best control method for working
at heights? What is the scaffolding method statement? What are the terms used
in scaffolding? How do you erect scaffolding step by step? What are the three
main scaffolding types?

Method Statement for Working at heights for scaffolding will also provide you with technical information working at
heights for scaffolding, and so on. Moreover, this method statement will also
enable you to make your document in various formats such as safe work method statement example, working at
heights jsa, working at heights method statement uk, working at heights
procedure, Scaffolding method statement example, safe work method statement
scaffolding, safety procedure in erecting scaffolding, scaffolding inspection
procedure pdf, scaffolding procedure, free scaffolding method statement
template, scaffold risk assessment, and method statement, dismantling
scaffolding procedures.

To download more
civil and other technical procedures, method statements, risk assessments,
checklists, and forms, keep visiting my website at “QHSE DOCUMENTS”
regularly and also share on your social media.


Table of Contents

1. Scope of Work

2. Location of works

3. Description of Works

4. Plant and equipment

5. Related documentation and assessments

6. Location and protection of any services/facilities affected by ongoing work

7. Foreseeable adverse effects and their control

8. Safety precautions

9. Monitoring systems

10. Further information/observations

11. Attachments


1. Scope of Work

The supply of labor and materials to assemble and dismantle scaffolding, following current British Standards, relevant legislation, and Approved Code of Practices.


2.  Location of works

2.1. Site Address- [Address for the project/site]

3. Description of Works

To supply, erect and dismantle the full scaffold and temporary roof to the above property, in conjunction with and strictly following supplied Engineer’s drawings. Fencing, pedestrian protection, and signage /lighting are to be supplied as necessary.

3.1.  Preparation of the Work Area

3.2.   Receiving and Taking Delivery of Materials

3.3.   Undertaking the Works

3.4.   Erection

Base Lift

NOTE: Minimum and maximum board overhangs will be observed (minimum 50mm and maximum 150mm)

NOTE: Minimum and maximum board overhangs will be observed (minimum 50mm and maximum 150mm).

3.5. Dismantling

3.6. Fall prevention

3.7. Rescue Plan

WE ALWAYS RECOMMEND THAT THE EMERGENCY SERVICES ARE THE FIRST TO ADMINISTER CARE TO OUR OPERATIVES ALTHOUGH IN CERTAIN CASES FULLY TRAINED FIRST AIDERS WILL NEED TO ACT


4. Plant and equipment

Minimum requirements for scaffolding work equipment:


5. Related documentation and assessments

* Copies available upon request.


6. Location and protection of any services/facilities affected by ongoing work


7. Foreseeable adverse effects and their control


8.  Safety precautions

[YOUR COMPANY] employees are not permitted to smoke on site.
The minimum PPE to be always worn, by scaffold operatives, whilst working on site is:


9.  Monitoring systems


10. Further information/observations


11. Attachments

11.1. Risk Assessment

11.2. Permit To Work at Height