METHOD STATEMENT FOR ALUMINIUM CUTTER MACHINE OPERATION WORK

1. Introduction And Scope

This method of statement specifies the detailed requirements and procedures for the MEP installation (PVC Conduits & Accessories Installation) of the above-mentioned project.

2. Tools And Equipment

Following are the tools you shall require for the better-quality Aluminium fabrication and cutting outcomes:

  1. Measuring Tape 
  2. Tri-square
  3. Masking Tape
  4. Marker
  5. Calculator

3. Wearing Hand Gloves, 

4. Health, Safety, And Environment 

Before commencing any work, the team shall strictly follow as per the Contractor Engr. & Procurement’s Health & Safety recommendations for handling and use of the materials. Make sure that all involved employees shall be well aware of the same. 

The general health and safety guidelines are following:

5. Procedure

a) Take profile from taping machine and place onto the Cutting machine, Check the oil level and air pressure 

b) Press the START Button (Only at Start of Shift)

c) Enter required dimensions on cutter machine from cutting list/ Optimization list. 

d) For the window, profiles Switch ON the laptop and choose the perspective and Cutting Dimension.

e) After entering the dimension, Press START Button to start cutting activity steps.

f) The cutting machine will automatically set the entered dimension.

g) Switch ON the Cutting Blade. (For window frames (as per your required measurements)

h) Hold Start Button to Clamp and start cutting the profile.

i) The machine will automatically Clamp the Profile

a. NEVER put your hands between the clamps.

b. Wear proper PPE such as earplugs and goggles before commencing the cutting

c. Hand gloves, safety goggles & safety shoes must be worn at all times.

j) Cutting will commence automatically.

k) Once cutting is complete, release Start Button to release the machine guard

l) Remove profile from cutting machine and store properly

m) Press the STOP Button to enter the next Dimensional Setting if you need to cut another piece. 

n) Place masking tape on the profile and write Project Name & Profile cut Size.

o) Press the Stop Button at end of Shift or if no more work is required for today.

p) If off cut will not be used, transfer to waste trolley, otherwise store in the proper place.

q) While handling profile offcuts, please wear hand gloves.

METHOD STATEMENT FOR ALUMINIUM CUTTER MACHINE OPERATION WORK 