To download the complete method statement for the Exterior and Interior light fittings luminary, click on the download link given at the end of this article text. just download and use.
- Installation of Light Fittings Luminary’s Exterior Interior works will be finished handiest concerning accepted shop drawings.
- The web page Electrical Engineer has to ensure that every one the lighting fixtures are obtained on the web site.
- The work site Electrical Engineer has to make certain that all the lighting fixtures are acquired at the website online in keeping with approved material submittal and according to approval.
- Make sure that all finishing works in all related areas are accomplished for the area of installation and released/cleared by the civil section to proceed with the Installation of Light Fittings Luminary’s Exterior Interior.
- The sort of Light Fittings Luminary’s Exterior Interior furnishings is to be decided on in step with the accepted schedule of lighting fixtures and authorized store drawing.
- Light Fittings Luminary’s Exterior Interior works shall be installed in exposed external areas shall be of the weatherproof type to protect its functionality and free from damages.
- Installation of Light Fittings Luminary’s Exterior Interior works shall be executed inline and parallel with every other line of furnishings as consistent with accepted keep drawings and fake ceiling drawings.
- Heavy lighting fixtures shall be supported from the ceiling using galvanized caddy clip and heavy gauge G.I. wire.
- Lighting/Light Fittings Luminary’s Exterior Interior works in service areas, where there is no false ceiling, fittings are to be fixed firmly using anchor bolts.
- Minimum 6 millimeters bolt and metallic enlargement anchor rods.
- Always remember while installing the fixing of lighting fixtures. Don’t install and fix the lights/fixtures above HAVC ducts, pipes, cable trays, And trunking will be averted. Set up as per the given layout and layout.
- The connection between lighting fixtures and ceiling roses is to be made only using heat resistance 3 core, 2.5 square millimeters, or 1.5 square millimeters flexible/wires.
- The ceiling rose location shall be easily accessible and should be not be installed above Air Conditioners ducts and cable trays.
- For safety purposes, all lighting fixtures shall be connected with earthing cable appropriately.
- Before solving lamps, all lighting is to be properly wiped clean from any dust or contaminates.
- Gloves will be utilized in works.
- Correct and encouraged general lamps are to be set up in lighting fixtures.
- Installation of louvers shall be installed and protected by polyethylene sheets.
- Care should be taken in fixing the fitting louvers and avoiding fingerprints or dust on the louver
- Before set up, all electrical cables, wires, and different related gadgets need to be examined, meggered, and scheduled for this reason and ought to be submitted to Engineers for approval, and information shall be maintained and kept as in keeping with the document retention time/period.
- Various components such as GI boxes, and round PVC boxes in concrete must be treated after plaster and the edges shall be accomplished well and clean. The wall finish shall be accomplished consistently around the box edges.
- The test effects ought to be submitted to the representative for document-maintaining functions and to satisfy legal and satisfactory requirements.
- Make sure that where luminaries are fixed directly to conduit boxes the final circuit connections are appropriately protected/safeguarded against the heat transfer from the luminaries lighting system
- For ease and proper destiny MEP/protection purposes, repair a label at every luminary which is linked to more than one circuit to read this luminary is connected to ‘X’ wide variety of circuits and is provided from distribution board Ref. ‘Y’. Isolate each circuit earlier than operating at the luminaire. Agree on label vicinity and format on site.
![]() |
| Method-Statement-Light-Fittings-Luminary’s |
